We use cookies to personalize content, interact with our analytics companies, advertising networks and cooperatives, and demographic companies, provide social media features, and to analyze our traffic. Our social media, advertising and analytics partners may combine it with other information that you’ve provided to them or that they’ve collected from your use of their services. Learn more.
Today I have collected my X-carve package from the post office and I have started building. The long wait is over, now it’s action time .
Just ready tapping the holes for the gantry. The three tap step procedure is super. This is so cool!
The bracket for the Makita is the only thing missing now, but I can do some more waiting while building the rest.
Congrats! And yeah, there’s a ton you can do before the mount shows up, the mount is only about ten minutes of the whole project at the end. You can get all the wiring done, all the electronics running, and even run programs without the y-carriage even there.
Here is the level of happiness;
Best Time = Starts with waiting for the X-Carve Shipment
Worst Time = Starts with After build until all Fine tuning is over.
Good Time = Starts when you see good production comes out.
So So Time = Starts with looking for upgrade possibilities.
Family time = Starts with your Wife’s scream.
Sleep Time = Starts anytime you put your ■■■ on the couch.
The build is now on hold for some days. We are preparing a big birthday party this weekend, celebrating 100 years combined between my wife and my self. Equal amount of years for both of us
I am not sure about the tensions of the belts. They seem very tight.
If I use a fish weight on the belt, what should the weight be in kg for lifting X cm? I have not tested current tension i kg.
Mine I pulled as tight as I could with my thumb on the bracket and my finger on the end-plate, then took it just a few turns tighter. Haven’t had to adjust it at all since, no sign of stretch at all, no slipping.
About the same as I did. Screw thight to bracket first, with a fearly thight belt. Then pushing screw through hole and entered nut. Tightened nut a couple of turns.
What did you do with the excessive belt outside the clip? I have a lot extra on the tightening side. It doesent’t seem to be in the way under there.
I cut it away, about a half-inch outside the shrink tubing on my own. My method was to fold the belt over as shown in the plans, then apply a small amount of superglue to the teeth and press them firmly together until the superglue set, then shrink tube over that.
Ok, I used shrinking tube and one small locking strip around that. I threaded up first hole and down the second. That way I could slide some of the shrinking tube between the belt and clip. No cutting of belt so far, but will try to do it later.
The cables ARE very short where they exit the drag chain, mine only has about 18 inches of cable left. It’s trivially easy to add as much more as you’d like, though. I haven’t, because the controller sits right next to the X-Carve on the bench. I think when I build my dedicated bench, I’m going to terminate them all into a single 38999-type connector, and have that mounted to the bench itself. Then I can just plug on a single wire harness and have the controller wherever I want it.